海词手机词典

The results show that, on the average, a ton of finished iron ore, crude copper and crude aluminum in 2000 have an abiotic material input of 4.19t, 476.36t and 103.97t and a water input of 4.82t, 204.94t and 1218.77t respectively.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌