海词手机词典

FCB tests under the real operating conditions with 50%, 70%, and 100% load were presented. The success of the tests proves the feasibility of FCB function for large coal-fired power generation units.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌