您要查找的是不是:
- multiprocessor job scheduling 多处理机任务调度
- Strict local job scheduling and uncontrolled data producers. 本地作业的调度很严格,且数据的产生是不受控制的。
- Job scheduling software will need to interact with provisioning software to account for the difference. 任务调度软件需要与自动配置软件进行交互来计算其间的差异。
- ID of the SQL Server Agent job schedule. SQL Server代理作业计划ID。
- Unique identifier of the job schedule. 作业计划的唯一标识符。
- User-defined name for the job schedule. 作业计划的用户定义名称。
- This is one of the job scheduling and process scheduling algorithm, the operating system of testing procedures! 这是一个关于作业调度和进程调度的算法实现,操作系统的试验程序!
- Chapin, J Karpovich, A Grimshaw. The Legion Resource Management System[C]. In:5th Workshop on Job Scheduling Strategies for Parallel Processing, 1999. 金之雁;王鼎兴.;异构系统中负载平衡扩散算法的加速方法
- Fourthly, resolve the problem that the job scheduling and real time feature adapt for the requirements of climate numerical nalue forecast job. 四、解决了气象数值预报计算任务对于作业调度的负载均衡和时效性要求。
- This, in turn, results in organizations turning their attention to marrying job scheduling technologies with provisioning and orchestration technologies. 这样,组织就可以将自己的注意力集中在如何一起应用作业调度技术和供应与自动配置技术上了。
- In the grid computing environment, resources are distributed, heterogeneous, dynamical and autonomous, so the job scheduling is one of the challenging task. 摘要由于网格资源具有分布、异构、动态、自治等特性,使得网格作业调度成为网格计算中具有挑战性的任务之一。
- This will be checked for compatibility with the assessed design and with the transport and erection conditions (climate, job scheduling, etc.) prevailing. 应检查手册是否与假定设计,交通及主要树立条件(气候,工作进程等)一致。
- Resource Scheduling Model Based on Multiprocessor Job in Network Parallel Computing System 网络并行计算系统中基于多处理机任务的资源调度模型
- ID of the master server from which the job schedule came. 作为作业计划来源的主服务器ID。
- The necessity and feasibility of the integration of process planning and production scheduling and the relations between CAPP and shop job scheduling are analyzed. 对工艺设计与生产调度集成的必要性和可行性进行了分析,讨论了工艺设计与车间作业计划之间的关系。
- Most of them are based on traditional hierarchical architecture and the top down approach and depend structurally on their specific configuration and job scheduling. 事实上,当前的大多数车间控制系统是基于传统的分层递阶结构和自顶而下的方法来开发的,结构上依赖于各自的具体配置和它们的作业调度。
- The paper analyzes the goals and strategies of grid job scheduling, and baded on it, puts forward a comprehensive job scheduling algorithm, and also gives a simulation result. 为此分析了网格作业的调度目标与资源分配策略,并在此基础上给出了一个综合的调度算法,以及一个仿真实验结果。
- Unable to remove job schedules from the job. The job cannot be saved. 无法从作业删除作业调度。该作业将无法保存。
- While grid computing focuses on how to optimize the IT infrastructure, through virtualization techniques, job scheduling, and load balancing, there is another equally important component: the information grid. 虽然网格计算侧重于如何通过虚拟化技术、作业调度和负载平衡来优化IT基础设施,但还有另一个同等重要的组件:信息网格。
- I am well aware that this is a tough job. 我深知这是一件棘手的工作。
以上内容独家创作,受著作权保护,侵权必究
海词词典,十七年品牌