您要查找的是不是:
- master test frame 集中测试台
- The test manager draws up the master test plan during the Inception phase. 测试经理在先启阶段草拟主测试计划。
- RUP uses a master test plan for the overall project and an iteration test plan per iteration. RUP对整个项目使用一个主测试计划,对每个迭代使用一个迭代测试计划。
- The master test plan and a detailed planning of test effort should be all that is produced prior to test execution. 主测试计划和测试工作的详细计划,应当是在测试执行之前所产生的所有文档。
- In any case, the master test plan needs to ensure that the ST and AT are complementary with regard to test coverage. 无论如何,主测试计划需要确保,系统测试和验收测试是有关测试覆盖的补充。
- The required organization is part of the template for the master test plan and the iteration test plan, but the corresponding activity is unclear. 需要的组织是主测试计划和迭代测试计划模版的一部分,但是相应的活动不清楚。
- The development and enforcement of the guidelines is the shared responsibility of the process engineers and should be consistent with the master test plan. 指南的开发和执行是过程工程师们的共有责任,并且应当是与主测试计划是一致的。
- PLC control of certain type missile test frame consists of PLC is composed of power supply module, local I/O signal, stepping motor, driver, position sensor, adaptor, up PC interface and so on. 某型导弹测试机架的PLC控制,由PLC、电源模块、现场I/O信号、步进电机、驱动器、位置传感器、适配器、上位机接口等组成。
- Its main contents include the following. Why would a Master test a disciple by having him build and demolish houses repeatedly over seventy times, just to select a successor? 主要开示内容包括:一位大师为了遴选继承人,一再地考验徒弟,不断拆建房子,前后达七十次之多,结果如何?
- One needs to consider that the scope of a TMap master test plan, in principle, addresses multiple test levels, whereas in RUP it can also be a single system test. 一个需要考虑TMap主测试计划的范围大体上会有多个测试级别,而在RUP中可以只是单个系统测试。
- The master test plan and, more concretely, the iteration test plan indicate which builds need to be tested. 主测试计划和更具体的迭代测试计划,需要简要说明哪个构建需要被测试。
- PLC Control of Certain Type Missile Test Frame 某型导弹测试机架的PLC控制
- Universal Test Frame and stand, Steel Tube Version 钢管型通用测试结构装置
- A simple test will show if this is real gold. 简单的试验就能证明这是否是真金。
- The cruel master beat his slaves with a whip. 残酷的主人鞭打他的奴隶。
- Structure Frequency Optimization Design of Test Frame 试验台架结构频率优化设计
- A great poet is a master melody. 大诗人也是音律大师。
- Design of dynamic testing frame for wing valves 翼阀动态试验架的设计
- I wish I could be a master of this subject. 但愿我能精通这门学科就好了。
- Pupils who pass the test will be promoted to the next higher grade. 小学生只要考试及格就会升到高年级。
以上内容独家创作,受著作权保护,侵权必究
海词词典,十七年品牌