海词手机词典

Work breakdown structure is the basis of project controlling and the model of duration-cost is put forward with the analysis of time and cost. AHP and FCE is used to weigh the risk of project cost, which is the basis of risk controlling.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌