英汉
汉语
更多
The results of static evaluation show that ore mining fee is the main part and amortization of both building and equipment and major materials fee are the secondary parts in the total cost of pithead heap-leaching mining.
英
美
释义
静态评价结果表明,在坑口堆浸总成本中,矿石开采费用占了相当份额,其次是土建工程及设备设施摊销费用、原材料费用。
以上内容独家创作,受著作权保护,侵权必究
海词词典,十七年品牌
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载
立即下载