海词手机词典

The project of Xixiaoping Bridge(DK107+921.80) was chosen as pre-stress concrete continuous box girder bridge,whose span is 48 m+80 m+48 m. As the bridge located in the seismic area of 7 degree,the seismic design should be made.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌