海词手机词典

Over temperature problem occurred on No 1 bearing bush of No 1 steam turbine while it was operating under rated conditions and load in Huaneng Shantou Power Plant.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌