海词手机词典

In this paper,a dual resource-based scheduling problem of flexible production systems is discussed,with the minimum earliness/tardiness(E/T) penalty as the objective.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌