英汉
汉语
更多
Because the channel bed was adjusted by scouring and silting in long-term, the required period to reach basically equilibrium was predicted based on the typical and assemble hydrographic data in long series after the building of Lijia flume dam.
英
美
释义
应用李家峡建坝后典型水文年长系列的组合资料,预报了河床经长期冲淤调整后达到基本平衡需要的时间。
以上内容独家创作,受著作权保护,侵权必究
海词词典,十七年品牌
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载
立即下载