海词手机词典

As customer will collect the Testing Jig on this Friday thus he determine to cancel the backlog Qty of the failure GBSF801 assume it is 60pcs and will be counted them as the Excess WIP In the E&O.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌