海词手机词典

As a rule, if material removal exceeds 0.0015 in (or 10 percent of the Almen strip intensity), the surface should then be shot-peened to CMM requirements.

播放读音 播放读音

以上内容独家创作,受著作权保护,侵权必究

海词词典,十七年品牌